Tarkett Flooring Installation Instructions

Before installation sheets and tiles should relax minimum 24h out of packaging.
Tarkett flooring installation instructions. The tongue side of the plank. Pvc or. Do not install damaged planks. These instructions combined with our adhesives and flooring products create a system.
If the heating pipes are too close to the flooring the flooring may discolor next to the pipe work. Check the rules in your country. Rolls and tiles must be stored during 48 hours before starting the operation. Measure distance between wall and surface of full plank.
For installation room temperature should always be above 15 c or 18 c for linoleum. During installation inspect the groove area and remove any debris that may prevent proper assembly of planks. Do not use a hammer and tapping block to install planks. The end joints of the planks in the first row.
Subtract 1 4 6 3mm or 1 2 12 7mm depending on the size of the spacer used from this measurement to allow for the spacer. Tarkett laminate8 installation instructions 2 locktarkett laminate9 installation instructions 2 lock finish remove the spacers from the perimeter of the room. However there are a few exceptions. In most cases you need to remove the existing floor covering.
Room temperature must be maintained between 65 ー workmanship is employed in the and 85 ーf 18 ー and 30 ーc with hvac system operating. Saw pencil tape measure vacuum cleaner step 1 prepare your subfloor to ensure a smooth installation it is important to prepare the surface. Install transition reduction profiles where needed. Place 1 4 6 3mm spacers between the short and long side of the planks and the wall use 1 2 12 7mm spacers for.
Rubber tile flooring installation instructions introduction these instructions are written as a guide to be used by professional installers when installing tarkett products. Ensure the subfloor is dry clean and flat. Installation begin laying planks from the left side of the starting wall and work to the right side. If this measurement is less than 12 20 3cm the length of first plank in the row must be cut.
Tarkett flooring and adhesives must be site conditioned at room temperature for a minimum of 48 hours prior to during and after installation. Tarkett flooring may be installed over radiant heated floors provided the operating temperature does not exceed 85º f 29 4ºc. Vinyl composition tile flooring. Remove your vinyl floor from its packaging and keep it in the room where it is to be.
To get started you need to do the following. Released may 2013 page 1 of 2 expressions vct inst 050713. Tarkett will not accept responsibility for claims on flooring installed with obvious defects. Heating pipes shall be at least 2 inches 50 8mm below the surface of the concrete.